Work done at NW10
Built side extension on top of garage
Knocked through 1st floor wall to extend into new extension
Installed bathroom and Velux in extension
Installed Crittal doors and windows
Electrics and plumbing
Installed steels and lintels
First stage
We installed 8 steel beams and soundproofed underneath the extension.
Building the extension
Topped off with a new roof with Velux windows. Inside the extension we installed a new bathroom.
Knocking through into the new extension
On the first floor an extra large doorway had to be cut out of the existing wall and a lintel installed.
The new bathroom installed
We had to plumb in between the void.
Installing doors and electrics
The lamps and the beautiful old Indian doors come from a great supplier.
The lovely fixed wall lamps that you see were unsafe, so our fab electrician took them home, worked on them and made them safe. We also put power points on the floor.
Installing Crittal doors
We had to alter the roof to make room for the Crittal doors.
Crittal doors installed
Looking in through the new doors.
And then... looking out